Raghava RevEngine · 90-day roadmap

From leaking leads to full site-visit calendars.

The first three months, 13 November 2026 to 13 February 2027, in four phases. Each phase fixes the stage that is losing the most buyers right now: first the follow-up, then the ads, then what the ads optimise for.

Term 13 Nov 2026 to 13 Feb 2027Projects Nova, Wave, CINQStatus Proposed, awaiting Sapni's yes
01 · The logic

Fix the bucket before pouring more in.

Six-month report

5,437 of 13,615 enquiries never reached. A third of the people reached qualify. Demand is not the problem.

Six-month read

Sales team review

Slow first calls, no discovery, no dated next step. Nova never called back at all.

Sales team review

So the order is

Follow-up standard and reactivation first, at zero ad cost. New spend second, aimed at site visits. Then optimise every channel to visits and bookings, not to form fills.

02 · The four phases

What happens, month by month.

Phase 113 to 20 Nov · Foundations
Access: Meta and Google ad accounts, pixel, CRM, drive, unit lists, RERA linesSapni, Shashank
Lead-level export; Nova follow-up list builtShashank, DecentraLabs
Nova reactivation starts: WhatsApp first, then a call that books the visitRaghava telecallers
Tracking audit: what reaches Meta and Google todayTousif, Shashank
Varun on site from Fri 20 Nov: first-contact standard, Nova then WaveVarun
Phase 221 Nov to 13 Dec · Nova live, follow-up fixed
Nova ads live once the RERA lines, timing and channel-partner rule are agreedMohit, Tousif
Reactivation moves to Wave (2,093 unreached), then CINQ (1,737)Telecallers, Varun
Every lead: one owner, call within 5 minutes, seven attempts, dated next stepVarun, team leads
Site visits counted weekly on all three projectsDecentraLabs
Wave and CINQ campaigns built and sent for approval; WhatsApp-first ads testedMohit, Tousif
Month-one review; lead-quality targets set in writing for month twoSapni, Mohit
Phase 314 Dec to 13 Jan · Scale what books visits
Wave and CINQ live on Meta and Google Search; budget moves weekly to the ads that produce held visitsMohit, Tousif
Site-visit and booking events sent back to Meta and Google, so they optimise to visitsTousif
New channels from More ways to advertise tested, one at a timeMohit
Search and AI answers (SEO, AEO, GEO) live on the project pagesMohit
Rep scorecards weekly; site-visit script and possession-date answers per projectVarun
Phase 414 Jan to 13 Feb · Compound
Cut what does not book visits; double what does. Lookalikes from booked buyersMohit, Tousif
NRI push, timed to your US and Gulf eventsMohit, Sapni
Three-month review against the 1.5x bookings aim, per projectSapni, DecentraLabs
Training sessions for the other project teams (Linq, Iris, Sage)Varun
03 · What we measure

Six numbers, per project, every week.

NumberTodayDay 90 aimTheir figure / agreed
Leads never reached (never called plus not answering)39.9% over six monthsHalved by the end of month one, then held
Qualified, of leads reached34.1% (Nova 47.7%, Wave 32.6%, CINQ 30.5%)Above 40% on every project (your target)
Site visits held from paid leadsNot counted todayWave 60 a month, CINQ 50 a month (your targets)
Direct bookingsOctober: CINQ 6, Wave 11.5x each project's agreed starting line
Cost per qualified leadNeeds spend by monthBelow October on CINQ (your target)
Speed to first callNot timed today; days in our reviewUnder 5 minutes in working hours
Starting lines need one decision. Wave's single October booking is too low to use, and Wave's labels changed in October. We agree each project's starting line in writing on this call or this week.
04 · What moves the dates

Five gates on your side.

  1. Nova return-to-market date. The channel-partner launch was planned for 15 November. Nova ads are timed to it. Open: Sapni
  2. Ad account and pixel access. Every campaign date moves a day for each day without it. Open: Sapni
  3. RERA lines and disclaimers per project. No ad runs without them. Open: Sapni
  4. Nova channel-partner rule that credits each buyer once. Nova follow-up runs regardless; Nova ads wait. Open: Sapni
  5. Lead-level export and CRM access. Without it the telecallers work from memory and nothing is timed. Open: Shashank

Private to Raghava and DecentraLabs. Proposed 16 November 2026. Tags: Proposed our plan awaiting your yes, Open waiting on the named person.